Multibuild Ltd are building a new £6m Premier Travel Inn at Manchester International Airport. Smyth Steel Ltd were engaged by Multibuild Ltd to design, supply and erect the structure and were on-board at an early stage to work closely with the design team. Smyth Steel also supplied metal decking, edge protection and fitting of precast stairs.
Sector: Leisure
Client: PTI
Location: Manchester, England UK
Contractor: Multibuild Limited
Architect: LRW
Engineer: Clancy Consulting
Key Statistics: 330 tonnes hot-rolled steel, 4,500sqm decking and studs, edge protection, precast stairs and full design-and-build.